信德海事网-专业海事信息咨询服务平台
  >  PORT

Ningbo-Zhoushan port's new 10m TEU box terminal to be completed in 2020


The Chinese port of Ningbo-Zhoushan is on target to finish construction of the new container terminal at Meishan that will have 10 container berths with a maximum annual handling capacity of 10 million TEU at full build-out.
 
The port has just commenced the construction of its ninth berth, which is due to open in 2020, reported Seatrade Maritime News, Colchester, UK.
 
The first phase of development includes five berths which are open for operation. The other five berths of the project's second phase includes two 200,000 tonne-class and three 150,000 tonne-class deepwater berths with a handling capacity of 4.3 million TEU.
 
In 2018, Ningbo-Zhoushan port handled 26 million TEU, ranking it the third busiest port worldwide.
 
Source:HKSG GROUP

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

admin@xindemarine.com


Ctrl+D 将本页面保存为书签,全面了解最新资讯,方便快捷。