信德海事网-专业海事信息咨询服务平台
  >  WORLD

Panamanian Merchant Registry annual tax discounts for Eco-Ship

Based on the Resolution No. 106-91-DGMM dated December 21, 2016 and Resolution No. 106-61-DGMM dated November 14, 2019, Panamanian Merchant Registry annual tax discounts can be obtained based on the following evidence:
 
·Calculated Attained Energy Efficiency Design Index (Attained EEDI) is equal to or less of the Calculated Required Energy Efficiency Design Index (Required EEDI), depending on the applicable phase established on Regulation 21, Annex VI, MARPOL, as follows:
 
Phase 1:
 
·From January 1st, 2015 until December 31st.,2019 the obtained Calculated Attained Energy Efficiency Design Index (Attained EEDI) is equal to 60% or less of the Calculated Required Energy Efficiency Design Index (Required EEDI).

Phase 2:
 
·From January 1st, 2020 until December 31st.,2024 the obtained Calculated Attained Energy Efficiency Design Index (Attained EEDI) is equal to 50% or less of the Calculated Required Energy Efficiency Design Index (Required EEDI).

Phase 3:
 
·From January 1st., 2025 the obtained Calculated Attained Energy Efficiency Design Index (Attained EEDI) is equal to 40% or less of the Calculated Required Energy Efficiency Design Index (Required EEDI).
 
·This requirement can be fulfilled by presenting copy of the International Energy Efficiency Certificate (IEEC) or Statement from the Recognized Organization indicating the values resulting from both calculations (Attained EEDI and Required EEDI);

Source: GMCG

 
The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


Ctrl+D 将本页面保存为书签,全面了解最新资讯,方便快捷。