On November 21, the world's first 7,500 m3 liquefied CO2 carrier No. 1 and No. 2, built by Dalian Shipbuilding Industry for Norway's Northern Lights, started construction.
The ship is specialized in marine carbon transportation and storage, with a total length of about 130 meters, a width of 21.2 meters, a structural draft of 8 meters, registered under the Norwegian flag, and classified into DNV.
![](/uploads/allimg/221122/5655-221122152446134.jpg)
The ship meets the most advanced EEDI Phase III requirements. The ship will be used in the European CCUS action plan after construction.
Source: Xinde Marine News Sarah Yu
The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.
Please Contact Us at:
media@xindemarine.com
![](https://www.xindemarinenews.com/uploads/allimg/171220/71-1G22009230S23.jpg)