XINDE MARINE NEWS
FPSO Almirante Barroso MV32 delivered in CHI Xinde Marine News 2022-06-20 14:05

On June 18, COSCO Shipping Heavy Industry (CHI) delivered the 11th converted FPSO Almirante Barroso MV32 for MODEC.
 
The project was converted from a VLCC with a length of 332 meters, a width of 58 meters and a depth of 31 meters. It is one of the largest FPSO projects in the world to be put into production. It is designed to operate in a depth of 1,900 meters, with a storage capacity of 1.4 million barrels of oil, a daily processing capacity of 150,000 barrels of crude oil, a daily processing capacity of 212,000,000 cubic feet of natural gas, and a daily production capacity of 240,000 barrels of water injection. The final operation was in the Búzios.
 
The project integrates production and treatment, storage and unloading, personnel residence and production command. It can operate continuously for 28 years without docking maintenance. Designed and built to the highest Brazilian technical standards, the accommodation can accommodate 160 people working and living at the same time.


The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


展开全文

Related Posts

The 100th LNG related vessel was ordered!!!

Xinde Marine News Pang Kai2024-07-25

8 VLACs Ordered Marks a Major Milestone in Ammonia Transport!

Xinde Marine News Pang Kai2024-07-24

CSSC delivered Five vessels in just FOUR days

Xinde Marine News Pang Kai2024-07-23

Fujian Guohang Ocean Shipping and Jiangsu Haitong Sign Contract for Two 63,500 DWT Bulk Carriers

xinde marine news Chen Yang2024-07-22

Celebrating Innovation and Excellence: The Delivery of "GAS HUANGHE

Xinde Marine News Pang Kai2024-07-19

Sikania II Hybrid: Bluferries New Passenger Hybrid Ro–Ro Ship designed by CTE Perdikaris and built

RINA2024-07-19