XINDE MARINE NEWS
FPSO Almirante Barroso MV32 delivered in CHI Xinde Marine News 2022-06-20 14:05

On June 18, COSCO Shipping Heavy Industry (CHI) delivered the 11th converted FPSO Almirante Barroso MV32 for MODEC.
 
The project was converted from a VLCC with a length of 332 meters, a width of 58 meters and a depth of 31 meters. It is one of the largest FPSO projects in the world to be put into production. It is designed to operate in a depth of 1,900 meters, with a storage capacity of 1.4 million barrels of oil, a daily processing capacity of 150,000 barrels of crude oil, a daily processing capacity of 212,000,000 cubic feet of natural gas, and a daily production capacity of 240,000 barrels of water injection. The final operation was in the Búzios.
 
The project integrates production and treatment, storage and unloading, personnel residence and production command. It can operate continuously for 28 years without docking maintenance. Designed and built to the highest Brazilian technical standards, the accommodation can accommodate 160 people working and living at the same time.


The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


展开全文

Related Posts

Resumption of Trading: The World’s Largest Shipbuilding Group is Born

Xinde Marine News Chen Yang2025-08-19

Seaspan Places Order for 12 New 9,000 TEU Vessels – Total of 67 New Ships All Built in China!

Xinde Marine News Chen Yang2025-08-18

CSSC and Seaspan Corporation Sign Landmark 9,000 TEU Container Ship Contract​,RMB Settlement

Xinde Marine News Chen Yang2025-08-18

Nanjing Tanker Corporation Plans to Build 2 New LR2 Product/Crude Oil Tankers

Xinde Marine News Chen Yang2025-08-15

King Ship (HK) Expands 63,000 DWT Multipurpose Order at TAIZHOU Kouan Shipbuilding to 12 Vessels

Xinde Marine News Pang Kai2025-08-13

Exciting Milestone in China's Shipbuilding Industry!

Xinde Marine News Pang Kai2025-08-08