XINDE MARINE NEWS
China's first LNG-powered cement carrier was successfully launched Xinde Marine News 2022-04-28 16:57

On April 23, "ZHONGJIRUNQING 106", the first LNG-powered cement carrier in China was successfully launched in Zhaoqing.
 
"ZHONGJIRUNQING 106" has a total length of 61.55 meters, a width of 10.8 meters, a depth of 4.3 meters, a load draught of 3.35 meters, a deadweight of 1,500 tons, and a design deadweight about 500 tons.
 
It can navigate in A-class inland navigation district, realizing real-time working condition monitoring of LNG-powered vessels and communication between ship and shore.
 
It is reported that the port throughput of Zhaoqing is expected to break through 200 million tons within 2 years. China International Marine Containers (Group) Co., Ltd. said that it will vigorously promote LNG-powered cement carriers, and plans to invest 300-500 cement carriers in the Pearl River within 3 years, helping to revolutionize the transportation mode of bulk cement.

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


展开全文

Related Posts

WOODSIDE AND CHINA RESOURCES AGREE LONG-TERM LNG SUPPLY

Woodside2025-03-18

Shanghai Yangshan Port Bunkered Two LNG Powered Containers at the Same Time

Xinde Marine News Pang Kai2025-02-28

Headway successfully delivers filtration skid solution for offshore platform

Headway2025-02-11

Celebrating the Launch of “Green Energy Pearl” – A New Milestone in LNG Transportation!

Xinde Marine News Pang Kai2024-12-19

PIL and SSES complete the inaugural LNG bunkering of PIL’s first LNG dual-fuel 14,000 TEU container

PIL2024-10-28

BW LNG secures e-procurement deal with Procureship for global LNG fleet 

Procureship2024-10-21