信德海事网-专业海事信息咨询服务平台

Yangzijiang Shipbuilding ushered in multiple production nodes

From January 1 to 8, 2021, Yangzijiang Shipbuilding will usher in multiple production nodes.

On January 4th, the third 12690TEU container ship built by Yangzi Xinfu was successfully undocked.
On January 4, the ninth 208000DWT bulk carrier built by Yangzi Xinfu for CDB Leasing was successfully undocked.
On January 5, a 1800 TEU container ship built by New Yangzi Shipbuilding for the Japanese shipowner was undocked.

On January 5, the third 50,000 dwt MR tanker built by New Yangzi Shipbuilding was successfully undocked.
On January 6, the fourth 208000 dwt bulk carrier "MP THE VRABEL" built by Yangzi Xinfu Shipbuilding for the owner of Mangrove Partners was successfully delivered.

On January 8, the first 40000DWT bulk carrier built by New Yangzi Shipbuilding for the German shipowner Vogemann was successfully carried on the 1# dock east line.

On January 8th, Yangzi Xinfu Shipbuilding completed the docking of two 325000DWT very large ore carriers built for Bocomm Leasing and KMARIN.
On January 8, the first 14000TEU dual fuel container ship built by Yangzi Xinfu for Tiger Gas started construction.
On January 8th, Yangzi Xinfu started construction of a 180,000DWT bulk carrier built for the owner of LEPTA.


Source: Sarah Yu, XINDE MARINE NEWS

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


Ctrl+D 将本页面保存为书签,全面了解最新资讯,方便快捷。